Fencing will be removed and the 100 Block will be open by the end of the day Friday December 2nd 2016. This Week: Energize street lights Completion of majority of brick work Clear work site...

The 19th annual Royal LePage Locations West Realty Santa Claus Parade is just around the corner! Bring a chair, blanket and hot cup of cocoa to Main Street on December 3rd, 2016 and watch...

This Week: Tree planting Final asphalt paving areas Sign installation Electrical & Street Light wiring Link Rd works continued Ongoing brick work Next Week/Coming Weeks: Line painting Bollard installation Vendor Power receptacle installation Energize Street...

Phase 2 Construction Update This Week: Pressuring testing storm drains Concrete pours including backing curb and ramps Asphalting (end of week) Brick paving stones – North East and West Wheelchair ramp installation Completions: Lamp bases Irrigation...

https://www.youtube.com/watch?v=Yj_WTGaDvWw Thanks to Castanet for coming down and covering our annual Halloween event! The rain and wind held out making for a wonderful evening of family fun with some incredibly cute (and spooky) costumes from...

This Week: Storm drain completion Lamp base installation completion Final curb pours, mid-block ramp and backing curbs Underground Electrical completion Brick Paving South East - pedestrian access maintained at all times Next Week/Coming Weeks: Brick...