LATEST ARTICLES

Fencing will be removed and the 100 Block will be open by the end of the day Friday December 2nd 2016. This Week: Energize street lights Completion of majority of brick work Clear work site parking lot Line painting (weather...
The 19th annual Royal LePage Locations West Realty Santa Claus Parade is just around the corner! Bring a chair, blanket and hot cup of cocoa to Main Street on December 3rd, 2016 and watch Penticton's festive floats make their...
This Week: Tree planting Final asphalt paving areas Sign installation Electrical & Street Light wiring Link Rd works continued Ongoing brick work Next Week/Coming Weeks: Line painting Bollard installation Vendor Power receptacle installation Energize Street Lights Ongoing brick work Parking 13...
Phase 2 Construction Update This Week: Pressuring testing storm drains Concrete pours including backing curb and ramps Asphalting (end of week) Brick paving stones – North East and West Wheelchair ramp installation Completions: Lamp bases Irrigation laterals Water mains Tree wells...
https://www.youtube.com/watch?v=Yj_WTGaDvWw Thanks to Castanet for coming down and covering our annual Halloween event! The rain and wind held out making for a wonderful evening of family fun with some incredibly cute (and spooky) costumes from people of all ages. Check...
This Week: Storm drain completion Lamp base installation completion Final curb pours, mid-block ramp and backing curbs Underground Electrical completion Brick Paving South East - pedestrian access maintained at all times Next Week/Coming Weeks: Brick paving works continuing Sign base...